3. How many public EVCPs are there within your local authority area? *
An EVCP refers to a device, not a location or connector. For example, in one single location, there may be two charging points. Each charging point may have 4 connectors/sockets. We are only looking for the ‘2” figure.

4. What is the most common speed of EVCPs within the local authority area?
Select N/A if there are no EVCPs within your local authority Select 'unknown' if you are not sure.
- Slow (3kw-6kw)
- Fast (7kw Single Phase)
- Faster (up to 22kw Three phase)
- Rapid (43kW AC/ 50kW DC)
- Ultra-Rapid (100+ kW DC)
- N/A Unknown

5. How many 22kW or above EVCPs is your local authority planning to install in the
next 12 months? Please use a whole number.

6. How many public EVCPs currently operate within your local authority?

7. Do public EVCPs need planning permission from your local authority?
- Yes
- No
- Dependent on location/infrastructure/case

8. Does the local authority currently operate any public EVCPs? * Mark only one oval.

9. Has the local authority a published Electric Vehicle, or Electric Vehicle Charging Point strategy in place?

10. How does your local authority plan to pay for installing future EVCPs? *
- Local Authority owned and operated
- Public/private partnership
- Wholly third-party owned and operated
- Decision not yet confirmed

11. What does the authority classify as the the greatest barrier to the deployment of public EVCPs?

12. Does your local authority/council/borough record data internally - on public EVCPs? For example, using Zap-Map would be 'No'
- Yes
- No

13.If yes to the above, please tick all the aspects of data recorded internally by your local authority
- Number of EVCPs
- Location of EVCPs
- Speed of EVCPs
- Whether the EVCP installation was notified to the DNO
- Ongoing maintenance/condition of the EVCP D
- Date of installation
- Installation provider
- How the EVCPs were funded
- Other forms of data (please provide info)

14.Within your local authority, what percentage (%) of public EVCPs are lamppost/curb-side chargers?

15. Last year, we asked how many 22kw public EVCPs were planned for installation within your area between September 2021 and September 2022. Did you achieve this target?
- Yes
- No
- Not Applicable - Did not have a target

16. If no, what % of your target did you achieve?

17.Have you received any of the following government funding for the installation of EVCPs?
- On Street Residential ChargePoint Scheme (OSRC)
- Local EV Infrastructure Pilot Scheme (LEVI)
- Ultra-Low Emission Taxi Infrastructure scheme (ULEV) now withdrawn
- Workplace Charging Scheme (WCS)

18.Does your EV strategy include information about safety? This could be either consumer safety or infrastructure safety
- Yes
- No
- N/A - No strategy in place

19.If yes to the above, what does your strategy state as the greatest safety issue surrounding EVCPs?
- Overloading the grid/grid capacity to handle increased demand
- Unsafe unsafe installation of EVCP
- Unsafe location of EVCP
- Lack of (working) EVCPs within reasonable distances of another Maintenance of EVCPs
- Tripping, or other physical charging cable hazard
- Other - please provide information

20. Please use this section as an opportunity to expand on your answers, elaborate on your strategy/policy, or provide any other information/comments.
This might include your wider opportunities and challenges, EV charging installation targets, renewable energy mixes, speeds, etc.

Response